19871988

Mors

The client wanted the dual function of this commercial building for prefab ceilings to be expressed in the design.

213 MORS Systeemplafonds N3 a4

Two parts overlap

The northern, most visible part of the site houses the representative functions of showroom and office, with walls of glass fitted with aluminium prefab frames. The storage room is situated in the southern part and has closed facades of profiled steel sheet plus a pair of doors for loading and unloading. The two parts overlap and share a supporting frame of ten slender lattice trusses.

213 MORS Systeemplafonds BCAD N3 medium
213 a4

Office with a view

The representative functions are located between and beneath the last four trusses, with the structure exposed to view. Here the showroom has the full height of the building, with the office quarters on a mezzanine placed on steel columns. The office has a view of the showroom, the storeroom and beyond, all the way across the wide open landscape of Noord-Holland province.

Architect & Interior Architect
Benthem Crouwel Architects
Graphic design
Samenwerkende Ontwerpers
Client
Mors Systeemplafonds, Opmeer
Location
Opmeer, The Netherlands
Gross floor area
1460 m²
Start design
1987
Completion
1988